Instructional Corporate Video

Submit Audition/Proposal on this Project
Rate this Project

Project Main Details

Instructional Corporate Video 
I am looking for someone to read 18 - 20 lines of text and will provide a sample (with my own voice) for you to reference if it would help.

The project is to help potential contractors understand the construction process of a new building by providing a short instructional video. 
2016-08-09 20:09:19 GMT
2016-08-10 06:00:00 (GMT -05:00) Eastern Time (US & Canada) 
Yes (click here to learn more about Voice123's SmartCast)
0 direct invitation(s) have been sent by the voice seeker resulting in 0 audition(s) and/or proposal(s) so far.
Voice123 SmartCast is seeking 20 auditions and/or proposals for this project (approx.) Invitations sent by SmartCast have resulted in 5 audition(s) and/or proposal(s) so far.

Project Parameters

The Voice Actor should be located in:
Fixed - USD 100
Training, business presentations, sales, and web sites
Via Internet: United States
English - USA and Canada
Middle Age Male
• Audio files must be delivered via email OR
• Audio files must be delivered via FTP/Dropbox/Google Drive/cloud
There are no special pre-, post-, or production requirements for this project.
Not defined
The voice seeker is willing to hire either union or non-union talents for this project
Male 30 - 55 years of age. Short instructional voiceover.

Script Details

Hello and thanks for joining us as we take a few moments to look at the process of using pre-assembled panels in the construction of a INSERT BUSINESS NAME building.

Before the panels arrive, the site should already have the underground utilities prepared, the slab should be poured, the steel should be in place and the site should be decently graded.

The panels arrive simultaneously on two different trucks and are part of the same shipment.

The panels are stacked on the truck according to placement so the top panel is the first to be placed.

While the panels are being placed, steel angles are being secured to the foundation via Tapcon to provide support to temporary bracing used during construction.

By hour 3 we’ve placed our first panel and by hour 5 we have completed the south wall.

We move to the east wall and continue the panel installation process.

We erect the west wall and then onto the North Wall.

The roof trusses are put into place one by one starting with the southern half of the building.

Once the trusses are in place, we brace and block the roof trusses. This illustration displays the proper way to install the blocking.

Additional panels have been installed for the tower and the curved roof portions are put into place and secured.

The windows are attended to and final site cleanup begins.

By hour 36, we are complete.

This crew specifically is four carpenters and four laborers.

Refer to the bid package for a list of materials to be provided by the general contractor.

Here, we can see the blocking overlayed on our image.

Here is a detail of the blocking required between each truss. See the construction drawings for more information.

Here, we can see a detail of the sheer wall anchor. See the construction drawings for more information. 
Please note that you should only use the script or your recording of it for auditioning purposes. The script is property, unless otherwise specified, of the voice seeker and it is protected by international copyright laws.

Voice-Seeker Details

Sign in to display the company name (if applicable)


Voice123 Team Comments

Voice123 consultations with this voice seeker regarding this project and/or other projects by this voice seeker, via phone, chat, and/or email.

unchecked This project - phone.

unchecked Previous projects - phone.

unchecked This project - email or chat.

unchecked Previous projects - email or chat.

checked Corporate web site for this voice-seeker confirmed by Voice123

Note: Voice123 strives to establish the legitimacy of all projects posted. However, Voice123 subscribers and users are responsible for confirming information stated by prospective voice seekers, agents and/or clients. Voice123 subscribers and users assume all liability for use of any information found through Voice123, or any of its publications.

This page contains the most important details of this project. If you find the information on this project inaccurate or inappropriate, please let us know by contacting us.

Submit Audition/Proposal on this Project