Short script segment for demo reel update

Submit Audition/Proposal on this Project
Rate this Project

Project Main Details

Short script segment for demo reel update 
Creating a training mock segment for our demo reel. We need VO based on the following script. Script is not complete, and may have changes, but content and length will not be affected. Final script will be supplied once final review is done. Overall tone is corporate training, installation, step by step instructions.

2011-07-26 18:39:20 GMT
2011-07-26 19:57:03 (GMT -05:00) Eastern Time (US & Canada) 
Yes (click here to learn more about Voice123's SmartCast)
Closed - Note: This project was manually closed by the voice seeker before it reached its original deadline.
0 direct invitation(s) have been sent by the voice seeker resulting in 0 audition(s) and/or proposal(s) so far.
Voice123 SmartCast is seeking 20 auditions and/or proposals for this project (approx.) Invitations sent by SmartCast have resulted in 0 audition(s) and/or proposal(s) so far.

Project Parameters

The Voice Actor should be located in:
Student or Non-for-profit student project - USD 100 to USD 200
Training, business presentations, sales, and web sites
Appx 2 minutes, <450 words
English - USA and Canada
See description
Middle Age Female OR Middle Age Male
• Audio files must be delivered via email OR
• Audio files must be delivered via FTP/Dropbox/Google Drive/cloud
• Deliver edited and finished voice tracks
Not defined
This is a non-union project

Script Details

***Please provide a sample in order to audition. 

The following is a condensed overview to familiarize you with the steps required during the installation of the ********************. Detailed step by step instructions will be presented in the following segment.


The first step is to unpack the ************** package, inventory the contents, review the installation manual, and select the area where the platform will be installed.


The area will need to be prepared to allow for a good adhesive bond.

Using the guidelines in the installation manual, mark the floor area to be prepared with rough guidelines.

Mark an area slightly larger than the mounting rails to allow for adequate leeway in final positioning.

As needed, use a hand scraper or rotary disk sander to remove all paint, adhesives, or flooring to expose the underlying concrete for the best adhesive bond.

Once the area is sanded, sweep up any debris and dust to ensure a clean surface.

TITLE: ************** PREPARATION

The mounting rails will now be prepared by installing the four set screws used for leveling, and the flange studs used for securing the ************** to the mounting rails.

Placing the rails on the floor in the spaces previously marked, the Force Platform is then attached to the mounting rails with 3/8" nuts and washers and secured.

Leveling screws are adjusted to achieve an approximate level, with fine leveling to be completed during the adhesive bonding process.


Various measurements, provided in the documentation, will need to be checked to insure proper placement of the **************.

Several measurements and leveling will be needed to insure correct placement for the existing raised floor height and positioning.

The ************** is roughly positioned using the indexing marks previously drawn.

With the ************** in position, measurements are taken on all four sides to insure the proper distance from existing flooring. The ************** is adjusted as needed to ensure proper spacing.

Once final positioning is accomplished, leveling is performed using a bubble level and adjustment of the set screws in the mounting plates.

Once all measurements have been made and verified, final marks are drawn on the floor to facilitate removal and replacement during the bonding process.


Using the supplied adhesives, a bead of adhesive is applied within the previously marked area. An even flow of adhesive is important to ensure complete coverage and minimize excess.

Once the adhesive has been applied, the ************** and mounting rails are then repositioned within the marked guidelines.

Measurements and leveling are again repeated to verify proper placement, and then left to sit 24 hours for adhesive curing.

These steps will be covered in more detail in the following segment.

Voice123 Note: Names, links, and contact information have been replaced by "*" symbols. If you have been invited to submit an audition or proposal for this project, you can sign in to see this information in full.
Please note that you should only use the script or your recording of it for auditioning purposes. The script is property, unless otherwise specified, of the voice seeker and it is protected by international copyright laws.

Voice-Seeker Details

Sign in to display the company name (if applicable)


Voice123 Team Comments

Voice123 consultations with this voice seeker regarding this project and/or other projects by this voice seeker, via phone, chat, and/or email.

unchecked This project - phone.

unchecked Previous projects - phone.

unchecked This project - email or chat.

checked Previous projects - email or chat.

checked Corporate web site for this voice-seeker confirmed by Voice123

Note: Voice123 strives to establish the legitimacy of all projects posted. However, Voice123 subscribers and users are responsible for confirming information stated by prospective voice seekers, agents and/or clients. Voice123 subscribers and users assume all liability for use of any information found through Voice123, or any of its publications.

This page contains the most important details of this project. If you find the information on this project inaccurate or inappropriate, please let us know by contacting us.

Submit Audition/Proposal on this Project